(Click on one of the thumbnails below for a larger image)
The slab is poured
Taken from the 5th floor of the
Classroom Building
(7/2/98): Rebar for Areas A & B before pouring concrete shown in the far back, with footings preparation
for Areas C & D
Before pouring slab, rebar laid
Taken from the
5th floor of the Classroom Building
(7/8/98)
Closer look at the slab on
grade
Taken from the Museum Building looking
west; slab on grade in the A & B Areas
Preparing for the ASRS
ASRS foundation excavation 1
ASRS foundation excavation 2:
water came up
ASRS foundation excavation 3: more water!
ASRS foundation excavation 4-6:
more water!
ASRS foundation
excavation 7-8: waterproof membrane laid